Installation Planning Paid Off |
Tuesday, July 7, 2026 |
| Reviewer:
Jonathan Cooper, Plumbing Contractor from Denver, CO
|
|
This thermostatic shower system was installed during a whole-home renovation where waterproofing and rough plumbing had to be completed before custom wall panels arrived. We reviewed the installation drawings, confirmed valve depth, and marked every concealed connection before closing the walls. That planning identified one incorrect pipe offset early enough to correct it without removing finished materials. Pressure testing passed on the first inspection, commissioning required only a minor temperature adjustment, and fifteen months later the thermostatic controls continue delivering stable performance with no leaks or service calls.
Was this review helpful to you?
|
 |
 |
 |
 |
|